Get my price

Blue Ash and northeast Cincinnati

Blue Ashkitchen remodeling

Price your new kitchen and see it in 3D before anyone sets foot in your house. It takes about a minute.

  • Priced from local wages
  • Full 3D design
  • Licensed local contractors

Watch the tool work

Your price, then your kitchen in 3D

A real recording of the tool. Line by line pricing first, then you design the room.

  1. 01
    A price you can read

    Every trade, every material and the permit, priced from what Cincinnati crews earn.

  2. 02
    Design before you commit

    Choose a layout, doors, counters and floors, then spin the room around in 3D.

  3. 03
    You decide who comes out

    No visit happens unless you ask for one.

60seconds to your price
3Ddesign of your kitchen
9kitchen services
14towns around Blue Ash

Why the price comes first

Three quotes, three different kitchens

Most homeowners collect a few quotes and end up more confused than when they started. One is half what the others are. One is 20% higher. None of them explain the gap.

That happens because a lot of quotes are guesses: a number that sounds right, or the same template sent to every house on the street. Nobody checked what electricians and tile setters earn around here this year, or what your cabinets and appliances actually cost.

So we checked. The price tool adds up your kitchen from Cincinnati labor rates, current material costs and permits, one line at a time. You see where every dollar goes. The contractor gets a fair price for the work, and so do you.

Same kitchen, three numbers

Quote ASomething is missing
Half the others
Quote BNo reason given
20% over
Your priceLine by line
Labor
  • Labor
  • Materials
  • Permits
  • Appliances

They tried it first

Homeowners using the price tool

Blue Ash Kitchens
JenDesigned her kitchen and knew the cost in 60 seconds
Blue Ash Kitchens
EdgarGot his kitchen priced without calling anyone
Blue Ash Kitchens
ConnorPriced and designed his kitchen without talking to a contractor

Swipe or tap a name to switch videos

Jen, Edgar and Connor were paid for their time.

Four steps

How a Blue Ash kitchen gets done

Nothing happens until you move to the next step.

  1. 01

    About a minute

    Price it

    Answer a few questions about your kitchen: how big it is, and whether cabinets, counters, an island, appliances, floors or lighting are part of the job. Enter your ZIP and you get three finish levels, each broken out line by line from Cincinnati trade wages.

  2. 02

    A few minutes

    See it in 3D

    Choose the layout that matches your kitchen, from a single wall to a U with an island. Then pick doors, colors, hardware, counters, backsplash and flooring, and walk around the room. The price changes with every pick.

  3. 03

    On your schedule

    Have it checked

    When you want to move forward, a licensed local contractor comes out, measures, looks behind the walls and confirms your number.

  4. 04

    Usually 4 to 8 weeks on site

    Build it

    The contractor pulls permits and orders cabinets, which usually take 3 to 8 weeks to arrive. Once work starts, a kitchen that keeps its layout usually takes 4 to 8 weeks.

Where we work

Blue Ash and the towns around it

Each dot is a town. Tap one for the age of its homes and the median home value. Bigger dots mean more homeowners.

Questions

What Blue Ash homeowners ask first

Oak kitchen with a long island, black pendants and leather counter stools
What does a kitchen remodel cost in Blue Ash?

It comes down to the size of the room, the finishes and how much of the kitchen is changing. Put those into the price tool and it builds your number from Cincinnati area wages in about a minute.

Will someone call me right away?

You give your name and mobile so your price can be sent to you. Nobody is sent to your house unless you ask for a visit.

How close is the online price to the real one?

It is built from local wages and a standard scope, so it is a solid starting point. A licensed contractor confirms the final number after seeing the room. Old wiring, floors that are out of level and load bearing walls are what usually move it.

Who issues kitchen permits around Blue Ash?

The cities and villages here, like Blue Ash, Montgomery and Sharonville, either run their own building office or contract with Hamilton County, so the contractor confirms which one before your price is final. Unincorporated areas like Kenwood go through Hamilton County Planning and Development. A cabinet and counter swap usually needs no permit. New circuits, moved plumbing or a wall coming out do.

How long will my kitchen be torn up?

Most kitchens that keep their layout take 4 to 8 weeks once work starts. Cabinets usually take 3 to 8 weeks to arrive, and that wait happens before demolition, not during it.

Ready to see your number?

About a minute. Your kitchen, your finishes, your price.